{"id":4956,"date":"2025-10-28T13:09:07","date_gmt":"2025-10-28T11:09:07","guid":{"rendered":"https:\/\/katsourisengineering.com\/building-identity-certificate-2026-who-risks-fines\/"},"modified":"2025-10-28T13:27:57","modified_gmt":"2025-10-28T11:27:57","slug":"building-identity-certificate-2026-who-risks-fines","status":"publish","type":"post","link":"https:\/\/katsourisengineering.com\/en\/building-identity-certificate-2026-who-risks-fines\/","title":{"rendered":"Building Identity Certificate 2026 \u2013 Who Risks Fines"},"content":{"rendered":"\n<p>The deadline for issuing the <a href=\"https:\/\/katsourisengineering.com\/en\/electronic-building-identity\/\"><strong>Building Identity Certificate<\/strong><\/a> for certain property categories is approaching. According to the Ministry of Environment and Energy, as of <strong>January 31, 2026<\/strong>, owners who have not completed the process may face fines ranging <strong>from \u20ac200 up to 10 % of the property\u2019s objective value<\/strong>.<\/p>\n\n<p>If you own a tourist accommodation, educational facility, hospital, fuel station, or any building open to the public, obtaining the certificate is now <strong>mandatory<\/strong>.<br\/>For all other properties, the Building Identity Certificate is required <strong>for every sale, donation, inheritance, or legalization of unauthorized constructions<\/strong>.<\/p>\n\n<p>In the following guide, you will learn who is required to obtain it, which documents are needed, and how to complete the process properly and without delays.<\/p>\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n<h2 class=\"wp-block-heading\">What Is the Building Identity Certificate<\/h2>\n\n<p>The Building Identity Certificate is the <strong>digital record<\/strong> of each property, confirming its legal status. Through the official TEE (Technical Chamber of Greece) platform (<a href=\"https:\/\/web.tee.gr\/\" target=\"_blank\" rel=\"noreferrer noopener\">web.tee.gr)<\/a>:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Building permit and architectural drawings<\/li>\n\n\n\n<li>Energy Performance Certificate (EPC)<\/li>\n\n\n\n<li>Declarations of building legalization<\/li>\n\n\n\n<li>Structural adequacy study or technical report<\/li>\n\n\n\n<li>Floor-area distribution tables and other legal documentation<\/li>\n<\/ul>\n\n<p>The process is carried out <strong>exclusively by a licensed engineer<\/strong>, who submits the data and issues the <strong>Certificate of Building Completeness<\/strong>.<\/p>\n\n<h2 class=\"wp-block-heading\">Who Is Obliged to Obtain It<\/h2>\n\n<p>Since <strong>February 1, 2021<\/strong>, the Building Identity Certificate has been mandatory for all private and public buildings (<a href=\"https:\/\/ypen.gov.gr\/ilektroniki-taftotita-ktiriou-ypochreotiki-apo-01-02-2021\/\" target=\"_blank\" rel=\"noopener\">Ministry of Environment and Energy<\/a>). However, the following categories must obtain it by <strong>January 31, 2026<\/strong>:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Tourist accommodations over 300 m\u00b2<\/li>\n\n\n\n<li>Schools and childcare facilities<\/li>\n\n\n\n<li>Hospitals and healthcare centers<\/li>\n\n\n\n<li>Public-assembly buildings (theaters, cinemas, gyms, etc.)<\/li>\n\n\n\n<li>Fuel stations, car washes, and repair workshops<\/li>\n\n\n\n<li>Public buildings and municipal facilities<\/li>\n<\/ul>\n\n<p>For all other buildings (residences, apartments, offices, etc.), the certificate is required whenever<\/p>\n\n<ul class=\"wp-block-list\">\n<li>there is a sale, donation<\/li>\n\n\n\n<li>legalization of irregularities<\/li>\n\n\n\n<li>issuance of a new building permit<\/li>\n<\/ul>\n\n<h2 class=\"wp-block-heading\">Deadline and Processing Time<\/h2>\n\n<p>The deadline for special building categories is <strong>January 31, 2026<\/strong>, as stated by the Ministry of Environment and Energy.<\/p>\n\n<p>The time required depends on the completeness of each file. If all documents are available, the certificate can be issued within a few days. If new surveys or records from local authorities are needed, it may take a few weeks.<\/p>\n\n<p><a href=\"https:\/\/katsourisengineering.com\/wp-content\/uploads\/2025\/10\/ypourgiki-apofasi-ilektroniki-taftotita-ktiriou-fek-b-334-2021.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">View the official Ministerial Decision on the Building Identity Certificate (Government Gazette B\u2019 334\/29.01.2021)<\/a><\/p>\n\n<h2 class=\"wp-block-heading\">Fines for Delay or Non-Issuance<\/h2>\n\n<p>Failure to issue the Building Identity Certificate on time results in penalties imposed by the Special Secretariat for Environmental Inspection:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>Minimum fine:<\/strong> \u20ac200<\/li>\n\n\n\n<li><strong>Maximum fine:<\/strong> Up to 10 % of the property\u2019s objective value<\/li>\n<\/ul>\n\n<p>The fines remain valid until the certificate is properly issued.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/katsourisengineering.com\/wp-content\/uploads\/2025\/10\/ilektroniki-taytotita-ktirioy-2026-1024x683.jpg\" alt=\"Engineer reviewing digital building plans on a tablet for the Building Identity Certificate\" class=\"wp-image-4952\" srcset=\"https:\/\/katsourisengineering.com\/wp-content\/uploads\/2025\/10\/ilektroniki-taytotita-ktirioy-2026-1024x683.jpg 1024w, https:\/\/katsourisengineering.com\/wp-content\/uploads\/2025\/10\/ilektroniki-taytotita-ktirioy-2026-300x200.jpg 300w, https:\/\/katsourisengineering.com\/wp-content\/uploads\/2025\/10\/ilektroniki-taytotita-ktirioy-2026-768x512.jpg 768w, https:\/\/katsourisengineering.com\/wp-content\/uploads\/2025\/10\/ilektroniki-taytotita-ktirioy-2026.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<h2 class=\"wp-block-heading\">Documents Required by the Engineer<\/h2>\n\n<p>To proceed, your engineer will need:<\/p>\n\n<ol class=\"wp-block-list\">\n<li>The original <strong>building permit<\/strong> with all revisions<\/li>\n\n\n\n<li>Updated <strong>architectural drawings<\/strong> and plans<\/li>\n\n\n\n<li><strong>The Energy Performance Certificate (EPC)<\/strong><\/li>\n\n\n\n<li><strong>Structural adequacy study or technical report<\/strong> (if required)<\/li>\n\n\n\n<li><strong>Legalization declarations<\/strong> for any unauthorized works<\/li>\n\n\n\n<li><strong>Ownership allocation tables<\/strong> (for multi-unit buildings)<\/li>\n<\/ol>\n\n<p>If some documents are missing, the engineer can issue a certificate of loss and create new digital drawings.<\/p>\n\n<h2 class=\"wp-block-heading\">Why You Should Act Now<\/h2>\n\n<p>The Building Identity Certificate is more than an obligation \u2013 it is the official assurance that your property is fully legal, safe, and ready for any transaction.<\/p>\n\n<p>Completing the process in time means you:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>avoid future fines and delays,<\/li>\n\n\n\n<li>are always prepared for property transfer or renovation,<\/li>\n\n\n\n<li>and strengthen the value and credibility of your property.<\/li>\n<\/ul>\n\n<p>At <a href=\"https:\/\/katsourisengineering.com\/en\/\">Katsouris Engineering<\/a>, we handle the <strong>entire process for you<\/strong> \u2013 quickly, accurately, and transparently.<\/p>\n\n<p>Our team takes care of:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>Legal and technical compliance checks<\/strong><\/li>\n\n\n\n<li><strong>Collection and digital upload of all documents<\/strong><\/li>\n\n\n\n<li><strong>Structural adequacy inspection <\/strong>(if required)<\/li>\n\n\n\n<li><strong>Submission to the TEE platform<\/strong> and issuance of the final completeness certificate<\/li>\n<\/ul>\n\n<p>This ensures your property is fully compliant and ready for any use or transaction.<\/p>\n\n<p>\ud83d\udce7 <a href=\"https:\/\/katsourisengineering.com\/en\/contact\/\"><strong>Contact us<\/strong><\/a> for a free file pre-check and an indicative offer.<\/p>\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n<h2 class=\"wp-block-heading\">Frequently Asked Questions<\/h2>\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list \">\n<div id=\"faq-question-1761646527209\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \"><strong>Do I need a Building Identity Certificate for an older property?<\/strong><\/h3>\n<div class=\"rank-math-answer \">\n\n<p>Yes. The obligation applies to all properties, regardless of construction year (Law 4495\/2017).<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1761646557048\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \"><strong>Can I sell my property without it?<\/strong><\/h3>\n<div class=\"rank-math-answer \">\n\n<p>No. A property transfer cannot be completed without the Certificate of Building Completeness.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1761646570402\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \"><strong>What if my drawings or permits are missing?<\/strong><\/h3>\n<div class=\"rank-math-answer \">\n\n<p>Your engineer can retrieve them from the local urban planning office or create new as-built drawings.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1761646597120\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \"><strong>How long does the process take?<\/strong><\/h3>\n<div class=\"rank-math-answer \">\n\n<p>From a few days to several weeks, depending on the completeness of your documents.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1761646606716\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \"><strong>How much does it cost?<\/strong><\/h3>\n<div class=\"rank-math-answer \">\n\n<p>The cost depends on the type and size of the property. At <strong>Katsouris Engineering<\/strong>, issuance <strong>starts from \u20ac200<\/strong> for standard apartments or small houses, with final pricing determined after file review.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>The deadline for issuing the Building Identity Certificate for certain property categories is approaching. According to the Ministry of Environment and Energy, as of January 31, 2026, owners who have not completed the process may face fines ranging from \u20ac200 up to 10 % of the property\u2019s objective value. If you own a tourist accommodation, [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":4955,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43],"tags":[],"class_list":["post-4956","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-permits-regulations"],"_links":{"self":[{"href":"https:\/\/katsourisengineering.com\/en\/wp-json\/wp\/v2\/posts\/4956","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/katsourisengineering.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/katsourisengineering.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/katsourisengineering.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/katsourisengineering.com\/en\/wp-json\/wp\/v2\/comments?post=4956"}],"version-history":[{"count":1,"href":"https:\/\/katsourisengineering.com\/en\/wp-json\/wp\/v2\/posts\/4956\/revisions"}],"predecessor-version":[{"id":4957,"href":"https:\/\/katsourisengineering.com\/en\/wp-json\/wp\/v2\/posts\/4956\/revisions\/4957"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/katsourisengineering.com\/en\/wp-json\/wp\/v2\/media\/4955"}],"wp:attachment":[{"href":"https:\/\/katsourisengineering.com\/en\/wp-json\/wp\/v2\/media?parent=4956"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/katsourisengineering.com\/en\/wp-json\/wp\/v2\/categories?post=4956"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/katsourisengineering.com\/en\/wp-json\/wp\/v2\/tags?post=4956"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}