Regularization of unauthorized constructions with compliance checks and full documentation. All constructions built beyond the approved building permit are deemed unauthorized.
The regularization process includes an on-site inspection and survey of the existing condition, followed by the preparation of new, detailed drawings.
It includes minor violations and cases of construction within or outside the town plan, with the aim of proper regularization and full documentation in accordance with current legislation.
Illegal constructions that fall under constructions before 1975 with residential use:
Illegal constructions that exist before January 1, 1983:
Subject to the provisions of this law, the imposition of penalties is suspended for thirty (30) years, following the submission, payment of the relevant fee, and the unified special penalty, with the reservation for the application of the provisions of Article 97. The following illegal constructions or changes of use apply: